Another step to prepare the boat for hibernation is to lay the mast. On our trimaran we do this with on-board equipment. A stable “lever triangle” is created from the main boom and two auxiliary spars. Then the mast can easily be folded with a simply redirected line.
top of page
bottom of page
Comments